The project carried out in 2017 represents the first stage of the investment, which has already reached the third stage of development.
The complex of buildings is made up of the logistics body and the administrative body, with a P+2E height regime and the possibility of overstorying on a metal solution.
The resistance structure is made of prefabricated reinforced concrete frames, with rigid nodes in the case of the office body, respectively articulated nodes for the storage hall.