The project carried out in the industrial area of Sibiu is the first of a successful collaboration with the German manufacturer of electronic parts.
The complex of buildings consists of production, storage and administrative buildings, with a height regime of up to P+2E.
The resistance structure is made of prefabricated reinforced concrete frames, with secondary metal closing structures.